Net Metering Guide Pakistan (2026): Green Meter Requirements & Process
Net metering lets solar owners export excess daytime electricity back to DISCOs such as LESCO, FESCO, IESCO, MEPCO, and K-Electric in exchange for bill credits that offset evening grid usage.
1. Minimum Eligibility Requirements
- Three-Phase Connection: Your existing utility meter must be a 3-phase connection (single-phase meters must be upgraded first).
- Minimum System Size: Generally 5kW or higher is recommended for practical approval and return on investment.
- Approved Equipment: Your hybrid or on-grid inverter must comply with NEPRA and IEC anti-islanding standards.
2. Required Documents for Green Meter Application
- Copy of applicant CNIC and latest paid electricity bill.
- Ownership proof (registry/allotment letter) or NOC from property owner.
- Single Line Diagram (SLD) and earthing test report prepared by an AEDB-certified installer.
3. Approval Timeline & Cost
From document submission to meter installation and licensing, the process typically takes 45 to 75 days. Including green meter hardware, earthing pits, and processing fees, homeowners usually budget between PKR 110,000 and PKR 160,000.